About a few problems of boiler room
From;    Author:Stand originally

Between boiler and building be apart from completely, should satisfy operation, overhaul and the need that decorate support features, should accord with following regulation:

One, be apart from completely before furnace: Steam boiler boiler of 1 ~ 4t/h, hot water is 0.7 ~ 2.8MW, unfavorable be less than 3.0m; Steam boiler boiler of 6 ~ 20t/h, hot water is 4.2 ~ 14MW, unfavorable be less than 4.0m; Steam boiler boiler of 35 ~ 65t/h, hot water is 29 ~ 58MW, unfavorable be less than 5.0m. Should need to change before furnace when boiler is in charge of, be apart from completely before furnace should satisfy operation requirement. To the steam boiler of 6 ~ 65t/h, the hot water boiler of 4.2 ~ 58MW, when furnace glue sets appearance control room, boiler front is controlled to appearance of the room be apart from completely can be 3m.

2, boiler flank and the passageway from the back are apart from completely: Steam boiler boiler of 1 ~ 4t/h, hot water is 0.7 ~ 2.8MW, unfavorable be less than 0.8m; Steam boiler boiler of 6 ~ 20t/h, hot water is 4.2 ~ 14MW, unfavorable be less than 1.5m; Steam boiler boiler of 35 ~ 65t/h, hot water is 29 ~ 58MW, unfavorable be less than 1.8m. Should need to blow ash, stir anger, when eliminating broken bits chance except broken bits, installation or overhaul helix, the passageway spurs the demand that should satisfy an operation completely.

The layer is operated between the boiler of burning hot area, can use open wide partly decorate or open the door in the wall before its. When operation layer is floor, the balcony is installed outside the door. The operation platform between boiler can connect according to needing to try. All support features inside boiler room and hot project are monitored, control equipment, should have an operation, when safeguarding need, should install platform and staircase.

Monolayer decorates the passageway of boiler room not to answer little at 2, when the footpath before furnace total length is not more than 12m, and when the area is not more than 200m2, its passageway can set 1 only. Multilayer decorate boiler room each passageway do not answer little at 2. The passageway on floor, due the emergency staircase that leads to the ground. Boiler leads to the door outdoor to answer outward open, the between direct boiler door between the workshop inside boiler room or life should to boiler inside open.